Dimension Max Β· NC, USA
Dimension Max Β· NC, USA

4G GPS Trackers for Vehicles, Trailers, Pets & Assets

Real-time GPS tracking with flexible monthly and annual plans. Fast U.S. shipping from North Carolina, U.S.-based support, and no long-term contract.

πŸ”’ Secure Checkout | πŸ‡ΊπŸ‡Έ US-Based Support | ⭐️ 30-Day Returns | πŸ“ Shipped from North Carolina

Dimension Max 4G GPS trackers for cars pets and assets

Shop 4G GPS Trackers

S20 Pro 4G GPS tracker for vehicles and assets

Top Pick for Vehicles & Fleets

S20 Pro GPS Tracker

Long-lasting battery, real-time anti-theft alerts, and magnetic placement for vehicles and assets.

$18.99 (Requires Data Subscription)

S20 compact 4G GPS tracker for pets and small assets

Best Value for Everyday Use

S20 GPS Tracker

Compact size, ideal for everyday tracking, pets, and small assets.

$15.99 (Requires Data Subscription)

GS20 installed 4G GPS tracker for vehicles with no charging

Best for Install-Once Tracking

GS20 GPS Tracker

Install once, no charging, with driving-safety visibility for harsh acceleration, sharp turns, and hard braking.

$16.99 (Requires Data Subscription)

GPS Tracking for Cars, Pets, and Assets

Vehicle GPS tracking with real-time anti-theft alerts

πŸš— Vehicle GPS Tracking

Protect your car with real-time GPS tracking and instant anti-theft alerts anytime, anywhere.

Pet GPS tracking with live location and safe-zone alerts

🐾 Pet GPS Tracking

Always know where your pet is with live tracking and alerts if they leave safe areas.

Asset GPS tracking for tools trailers and equipment

🧰 Asset GPS Tracking

Keep track of valuable equipment and tools with real-time visibility and location updates.

TrackerOne GPS Tracking Platform & Mobile App

Use the TrackerOne App to monitor compatible Dimension Max GPS trackers with real-time location updates, movement history, geo-fence alerts, and device status.

TrackerOne GPS tracking app showing real-time location

Real-Time Location

View the current location of your vehicle, pet, or asset from the TrackerOne App.

TrackerOne GPS tracking app showing movement history

Movement History

Review past routes, stops, and location records when you need more tracking detail.

TrackerOne GPS tracking app showing fence alarm

Geo-Fence Alerts

Create safe zones and receive alerts when a tracker enters or leaves an area.

Why Dimension Max GPS Trackers?

  • Real-Time 4G Visibility: Get instant location updates and route history straight to your mobile device.
  • Customizable Alerts: Set geo-fences and receive immediate notifications if a vehicle or pet leaves the designated safe zone.
  • Flexible Subscription Plans: No forced bundles. Buy the hardware today and activate your monthly or annual service only when you’re ready to track.
  • Built for Real Life: From securing remote construction trailers to monitoring a teen driver, our hardware is chosen for practical deployment.

Transparent Pricing: Hardware First, Activate Later

  1. Get the Device: Order your S20, S20 Pro or GP30 Pet tracker.
  2. Pick a Plan: Choose a data plan starting at $8.99/month, or save with an annual plan.
  3. Start Tracking: Activate your device and connect via our app. Cancel or pause your subscription anytime without penalty.
  4. No hidden fees. No long-term contracts. Choose monthly or annual service based on your tracking needs.

Advanced 4G GPS Tracking Solutions from a US-Based Seller

Our 4G GPS trackers are designed for real-time location tracking for cars, pets, equipment, and valuable assets worldwide. When it comes to protecting what matters most, a reliable GPS tracker for cars, equipment, pets, and family members is essential. At Dimension Max, we provide 4G GPS tracking devices designed for accurate, real-time location monitoring through compatible cellular networks. Whether you need a hidden GPS tracker for anti-theft vehicle security, asset monitoring for job sites, or a dependable way to help keep pets safe, our devices offer practical tracking without complicated setup. As a US-based seller operating out of North Carolina, we provide fast shipping, clear service plan options, and tracking hardware you can actually rely on.

Frequently Asked Questions

Do I need a subscription to use the GPS tracker?

Yes. To connect to the cellular network and provide real-time location updates, a monthly or annual data subscription is required.

How long does the battery last on the S20 Pro?

Battery life depends on update frequency, signal strength, and usage mode. In low-frequency tracking mode, the S20 Pro may last up to 9 months on a single charge; more frequent tracking updates will reduce battery life.

Does this GPS tracker support worldwide coverage?

Yes. Our 4G GPS devices are designed to support worldwide coverage through compatible cellular networks. Actual availability may vary by country, carrier, signal strength, and service plan.

Where does my order ship from?

All orders are processed and shipped directly from Apex, North Carolina, ensuring quick delivery to your door.

Does the device price include tracking service?

Hardware-only prices do not include tracking service. Real-time GPS tracking requires an active monthly or annual data plan. A 1-year service option is also available for customers who want service included upfront.

What is included with the hardware-only option?

The device is included. Real-time tracking service is not included and requires an active monthly or annual data plan.

What is included with the 1-year service option?

It includes the GPS tracker device and 12 months of tracking service. Renewal is required after the included period to continue real-time tracking.

US-Based GPS Tracker Seller

Dimension Max LLC is based in Apex, North Carolina. We ship GPS tracking hardware from the U.S. and provide clear service plan options before activation.

Business location: Apex, NC
Support: support@dimensionmax.com
Returns: 30-day return policy