TrackerOne GPS Tracking Platform & Mobile App
Monitor vehicles, pets, and assets in real time with the TrackerOne GPS tracking platform and mobile app. Connect compatible Dimension Max GPS trackers, view location history, set geo-fence alerts, and manage service plans from one account.
What Is TrackerOne?
TrackerOne is the GPS tracking platform and mobile app used with compatible Dimension Max GPS tracking devices. After activating a monthly or annual service plan, TrackerOne helps you monitor real-time location, movement history, geo-fence alerts, and device status for vehicles, pets, and assets.
Real-Time GPS Tracking
View the current location of compatible GPS trackers through the TrackerOne app and platform.
Location History
Review past routes, stops, movement records, and tracking activity when you need more detail.
Smart Tracking Alerts
Receive movement alerts and geo-fence notifications when a tracker enters or leaves selected areas.
TrackerOne App Features
The TrackerOne GPS tracking platform is designed to make everyday tracking easier. Whether you are monitoring a car, checking a petβs location, or managing valuable equipment, TrackerOne gives you a simple way to stay connected.
Vehicle Location Monitoring
Track cars, trucks, motorcycles, trailers, and other mobile assets with compatible 4G GPS trackers.
Pet Tracking Support
Use TrackerOne with compatible pet GPS trackers to view live location, movement history, and safe-zone alerts.
Asset Tracking
Monitor tools, equipment, bags, trailers, and valuable assets with location visibility from your phone.
Geo-Fence Zones
Create virtual zones and receive alerts when a tracker enters or leaves a selected area.
Mobile App Access
Access tracking information from your phone after your compatible GPS tracker is activated.
Device Status
View important device information such as connection status, recent updates, and available tracking details.
How TrackerOne Works
TrackerOne connects your GPS tracking hardware, service plan, and mobile tracking experience into one simple workflow.
Choose a GPS Tracker
Select a compatible Dimension Max GPS tracker for your vehicle, pet, or asset tracking needs.
Activate a Service Plan
Real-time tracking requires an active monthly or annual service plan based on device type.
Connect to TrackerOne
Connect your compatible device to the TrackerOne GPS tracking platform and mobile app.
Start Tracking
View live location, movement history, geo-fence alerts, and device status from your phone.
Compatible GPS Trackers
TrackerOne works with selected Dimension Max GPS tracking devices. Choose the device that fits your tracking needs, then activate a service plan to enable real-time GPS tracking.
S20 Pro 4G GPS Tracker
Recommended for cars, trailers, tools, equipment, and asset monitoring.
- Real-time anti-theft alerts
- Long battery tracking options
- Works with the TrackerOne app
S20 Compact 4G GPS Tracker
Recommended for everyday tracking, pets, bags, and small assets.
- Compact tracking device
- Flexible use for small items
- Works with the TrackerOne app
GP30 Pet GPS Tracker
Recommended for dog and cat location tracking with compatible service plans.
- Designed for pet safety
- Live location and movement history
- Works with the TrackerOne app
Need Help Choosing?
Not sure which GPS tracker fits your needs? Compare vehicle, pet, and asset tracking options before you buy.
- Vehicle and asset tracking options
- Pet tracking device options
- Monthly and annual service choices
Product availability, service compatibility, and feature access may vary by device model, service plan, and network coverage.
TrackerOne for Cars, Pets & Assets
TrackerOne is built for real-world tracking needs. Use compatible GPS trackers to help monitor vehicles, pets, valuable assets, tools, trailers, and everyday items.
Vehicle GPS Tracking
Use TrackerOne to monitor compatible GPS trackers for cars, trucks, motorcycles, trailers, and mobile assets.
Pet GPS Tracking
Check your petβs location, review movement history, and receive safe-zone alerts with compatible pet trackers.
Asset GPS Tracking
Track tools, equipment, bags, trailers, and valuable assets with real-time visibility from the TrackerOne app.
Service Plans for TrackerOne
TrackerOne real-time tracking features require a compatible GPS tracker and an active service plan. You can purchase hardware first and activate service when ready, or choose a bundle that includes service upfront.
Hardware Only vs. Service Included
- Hardware Only: Includes the GPS tracking device. Real-time service is not included.
- Monthly Service: Activate a monthly data plan based on your device type.
- Annual Service: Choose annual service when you prefer prepaid tracking.
- 1-Year Service Option: Selected devices may be available with 12 months of service included.
Service pricing may vary by device type. Vehicle and asset tracker plans may differ from pet tracker plans.
Worldwide Tracking Support
TrackerOne works with compatible 4G GPS devices and cellular networks. The platform is designed to support worldwide tracking coverage where compatible service, carrier access, signal strength, and device configuration are available.
Worldwide Coverage
Designed to support compatible GPS tracking coverage through cellular networks in supported areas.
Carrier-Based Availability
Actual availability may vary by country, local carrier, signal strength, service plan, and device model.
US-Based Seller
Dimension Max LLC is based in Apex, North Carolina, with support available through support@dimensionmax.com.
TrackerOne FAQ
Common questions about the TrackerOne GPS tracking platform, compatible devices, and service plans.
Is TrackerOne a GPS tracking app?
Yes. TrackerOne is the GPS tracking platform and mobile app used to monitor compatible Dimension Max GPS trackers.
Do I need a service plan to use TrackerOne?
Yes. Real-time tracking through TrackerOne requires a compatible GPS tracking device and an active monthly or annual service plan.
Which devices work with TrackerOne?
TrackerOne works with selected Dimension Max GPS trackers, including compatible S20, S20 Pro, and GP30 devices. Compatibility may vary by model and service plan.
Does TrackerOne support worldwide coverage?
TrackerOne is designed to support worldwide coverage through compatible cellular networks. Actual availability may vary by country, carrier, signal strength, device model, and service plan.
Can I track multiple devices in TrackerOne?
Yes. TrackerOne can be used to manage multiple compatible GPS trackers from one account, depending on the service plan and device setup.
Does hardware-only pricing include TrackerOne service?
No. Hardware-only pricing includes the GPS tracking device only. Real-time tracking through TrackerOne requires an active monthly or annual service plan.
What features are available in TrackerOne?
TrackerOne may include real-time location, movement history, geo-fence alerts, device status, and multi-device management. Available features may vary by device model and service plan.
Ready to Start Tracking with TrackerOne?
Choose a compatible Dimension Max GPS tracker, activate a flexible service plan, and monitor vehicles, pets, and assets through the TrackerOne app.